OEG-CML-002 · NOT_ESTABLISHED

The 800VDC / SST architecture has been replicated by multiple independent entities.

The public record supports a single operator-reported instance, not replication across independent operators or sites.

Frozen evidence boundary

What the current record does and does not establish

Evidence cutoff: 2026-09-20T10:46:47Z

GAP_ID

OEG-CML-002

CASE_ID

CML-PDRE-001

CLAIM

The 800VDC / SST architecture has been replicated by multiple independent entities.

CURRENT STATE

NOT_ESTABLISHED

SCOPE

The public record supports a single operator-reported instance, not replication across independent operators or sites.

EVIDENCE CUTOFF

2026-09-20T10:46:47Z

WHAT IS ESTABLISHED
  • A single named operator reported one materially relevant field deployment.
WHAT IS NOT ESTABLISHED
  • A second independently attributable deployment
  • Multi-operator replication
  • Repeat procurement or industry adoption
WHAT WOULD CHANGE THIS

A public record for another attributable operator or independently controlled site showing a materially comparable deployed architecture and operating status.

ACCEPTABLE SOURCES
  • Named operator commissioning record
  • Regulatory or grid-connection record
  • Independent case study identifying operator, site, architecture, and date
NON-QUALIFYING SOURCES
  • Multiple articles about the same site
  • Planned projects without commissioning
  • Vendor pipeline totals without named deployments

Public evidence challenge

Challenge this gap

No payment, quote request, or sales qualification is required.

References only. Do not submit files, private records, credentials, or personal health information.

Separate commercial path

Need this evaluated for your decision?

Commercial verification is a paid decision scope and is never required to submit a public evidence challenge.

Open commercial verification