CML-PDRE-001 · append-only Phase B review

800V DC Source Dependency View

A time-bounded, independently checkable decision-boundary record: who originated each reviewed source, how its classification evolved, and what remains unknown. It is not an authoritative truth claim or a decision recommendation.

Source Dependency View · Phase B

Who is actually saying this?

Nine reviewed URLs resolve to seven originating evidence lineages. Different hosts and renderings are not treated as independent observations.

Time-bounded result, not authoritative truth: No reviewed row qualifies OEG-CML-001 or OEG-CML-002 under the active gap-specific rules. This is zero inside the declared source packet, not proof that no qualifying evidence exists elsewhere. Unknown does not mean false, and a qualified source would not by itself determine an investment, purchase or deployment decision. The preserved case state remains unchanged.
9reviewed URLs
7originating lineages
7originators
0independent originators
0qualifying rows per gap

Evidence cutoff: is the boundary for evidence admitted to this view.

Last source check: is the latest recorded availability/source check; individual rows retain their own check times. It currently coincides with, but is not the definition of, the evidence cutoff.

Method: SE-SOURCE-DEPENDENCY-RUBRIC-v0.2; Phase B classification reviewed .

Review capability: One actual Phase B reviewer record. SECOND_REAL_HUMAN_REVIEW=UNSUPPORTED. No second independent human reviewer has been identified, engaged or evidenced; this is engineering-nonblocking and has no evidence-state effect.

Chindata E3/E4: UNRESOLVED. V1 E4 rows remain preserved. V2 appended a conservative E3 ceiling because observation period and method are missing, but E3 is also imperfect because the record is attributable. The ambiguity cannot promote either gap.

Rule correction: v0.2 adds ADDITIONAL_ENTITY_OR_SITE to OEG-CML-002, matching the frozen requirement that the baseline Chindata instance cannot count as its own replication.

Open machine-readable view · Open nine-source matrix · Open append-only row ledger · Open active qualification rules

Decision boundary

Scoped questions: Is there an independent attributable field record for OEG-CML-001, and is there an additional operator or independently controlled operating site for OEG-CML-002?

Current support: One operator-authored Chindata record reports a named deployment; the other sources provide design, laboratory, certification-publicity, prototype or future-agreement signals.

Contradiction: No qualifying contradiction was established within this bounded packet.

Unknown: Independent field validation and multi-entity replication remain unestablished within these nine URLs.

Closure: Each gap closes only when a row satisfies every active rule facet and dependency requirement. Publisher-host duplication cannot establish an additional entity or site.

Decision ownership: This view issues no investment, purchase, architecture, deployment or rejection recommendation. The customer owns the decision and its exposure thresholds.

Fact and classification evolution

  1. 2026-09-20 — original observation: the preserved case recorded one operator-reported Chindata deployment; it was not independent validation.
  2. 2026-10-25 — V1 review: the original Chindata rows recorded E4. Those events and hashes remain preserved.
  3. 2026-10-25 — V2 append-only supersession: two successor rows applied a conservative E3 ceiling; the E3/E4 taxonomy dispute remained unresolved.
  4. 2026-10-25 — acceptance boundary: second real human review was recorded as unsupported and engineering-nonblocking. No evidence conclusion or case state changed.
Nine source URLs classified against independent validation and multi-entity replication. Expand each row for lineage, scope, cutoff, access and row IDs.
Source / lineageDependencyEvidenceGap result
Chindata commercial-operation announcementChindata · operatorLineage root: CHINDATA-533ISSUER_AUTHOREDThe operator is describing its own named campus.E3 · contestedConservative ceiling after the E4 site/period/method consistency review; attribution is retained as a separate fact and the E3/E4 dispute is unresolved.NOT_QUALIFIEDOEG-001 lacks observation period, conditions and methodology; OEG-002 lacks an additional entity or site.
Audit fields

Access: READ_PARTIAL structured packet · Last checked: 2026-10-14 · Cutoff: 2026-10-22 · Rubric: v0.2 · Second real human review: UNSUPPORTED

Active rows: SE-SOURCE-ROW-CML-PDRE-001-INDEPENDENT-VALIDATION-CHINDATA-533-V2 and SE-SOURCE-ROW-CML-PDRE-001-REPLICATION-CHINDATA-533-V2. The V1 E4 rows remain preserved as superseded events.

Siemens + Reinhausen development releaseSiemens and Maschinenfabrik Reinhausen · suppliersISSUER_AUTHOREDThe developers authored the record.E1Development and industrialization, not operation.NOT_QUALIFIEDE1 is below both gaps' E4 minimum.
Audit fields

Search: SE-800V-REVIEW-20261014-01 · Access: READ_PARTIAL · Cutoff: 2026-10-22 · Rubric: v0.2

Vertiv architecture event pageVertiv · supplierISSUER_AUTHOREDThe event host authored the architecture signal.E0Architecture discussion without a named operating deployment.NOT_QUALIFIEDE0 is below both gaps' E4 minimum.
Audit fields

Search: SE-800V-REVIEW-20261014-01 · Access: READ_PARTIAL · Cutoff: 2026-10-22 · Rubric: v0.2

SolarEdge origin announcementSolarEdge Technologies · supplierISSUER_AUTHOREDOrigin for the PDF and Business Wire copies below.E2Engineering-lab stage and showcase model; full-path validation underway.NOT_QUALIFIEDE2 is below both gaps' E4 minimum.
Audit fields

Search: SE-800V-REVIEW-20261015-01 · Access: READ_PARTIAL; origin blocked direct raw retrieval · Cutoff: 2026-10-22 · Rubric: v0.2

SolarEdge official PDF renderingSolarEdge Technologies · supplierDERIVEDSame SolarEdge lineage as the origin announcement.E2Reproduces the same lab-stage content.NOT_QUALIFIEDDoes not add a source lineage or field evidence.
Audit fields

Lineage parent: SOLAREDGE-ORIGIN-20261013 · Access: READ_PARTIAL · Rubric: v0.2

Business Wire distribution copySolarEdge Technologies · distributed by Business WireDERIVEDA second host is not a second observation.E2Reproduces the same lab-stage content.NOT_QUALIFIEDDoes not add a source lineage or field evidence.
Audit fields

Lineage parent: SOLAREDGE-ORIGIN-20261013 · Access: READ_PARTIAL · Rubric: v0.2

Sungrow EnerNeo certification announcementSungrow AIDC · supplierISSUER_AUTHOREDUnderlying certificate was not independently authenticated.E2Attributed certification publicity without a named operating customer.NOT_QUALIFIEDE2 is below E4; certificate ID, complete scope and issuer record remain missing.
Audit fields

Search: SE-800V-REVIEW-20261017-SUPP-PR26-01 · Access: READ_PARTIAL; fresh retrieval blocked HTTP 403 · Rubric: v0.2

Power Integrations + Ideal Power SSCB prototypePower Integrations and Ideal Power · suppliersISSUER_AUTHOREDThe collaborating suppliers authored the release.E2Working component prototype, not system deployment.NOT_QUALIFIEDE2 is below both gaps' E4 minimum.
Audit fields

Search: SE-SOURCE-CML-PDRE-001-20261012-SSCB · Access: READ_PARTIAL · Rubric: v0.2

Vantage + Heron capacity agreementVantage Data Centers and Heron Power Electronics · customer/supplierPARTIALLY_DEPENDENTDisclosed commercial agreement and joint authorship.E0Future capacity reservation; no delivered or commissioned system.NOT_QUALIFIEDE0 is below E4 and no operating site is identified.
Audit fields

Search: SE-EVENT-CML-PDRE-001-20261021-VANTAGE-HERON · Access: READ_PARTIAL · Last checked: 2026-10-22 · Rubric: v0.2

Challenge the evidence

Use the existing gap-specific, reference-only intake for OEG-CML-001 or OEG-CML-002. Submissions are private until human review, accept public URLs or document references rather than file uploads, and cannot automatically change a claim or case state.

Privacy boundary: Do not submit files, private records, credentials, personal health information, private contracts or other sensitive data. Contact email is optional and is not public.

Broader Open Challenge v0.1: NOT_LAUNCHED. Phase B creates no new intake endpoint and grants no production authorization; any broader experience still requires separate security, rate-limit, moderation, retention, privacy and human deployment gates.

Language routes preserved: English · 中文 · Español.

Lineage map

Seven origins behind nine URLs

Lineage is an authorship and dependency map, not a truth score.

  • CHINDATA-533 — operator-authored deployment assertion.
  • SIEMENS-REINHAUSEN-2026 — supplier development release.
  • VERTIV-DCD-2026 — supplier architecture-event page.
  • SOLAREDGE-ORIGIN-20261013 — origin for the official HTML, official PDF and Business Wire rendering; three URLs count as one lineage.
  • SUNGROW-1749 — supplier certification publicity.
  • PI-IDEAL-SSCB-20261012 — supplier prototype release.
  • VANTAGE-HERON-20261021 — joint future-capacity agreement.

Inspect the row-level lineage, authorship and counterevidence matrix.